WECC develops and implements Regional Reliability Standards and WECC Regional Criteria specifically for the Western Interconnection. Regional Entities have the unique ability to draft documents tailored to their region, leveraging subject matter experts who understand the physical and operational nuances of the local high-voltage grid. WECC also actively participates in the NERC Reliability Standards Development processes.

NERC Reliability Standards define the reliability requirements for planning and operating the North American Bulk-Electric System (BES) and are developed using a results-based approach that focuses on performance, risk management, and entity capabilities. The Reliability Functional Model defines the functions that need to be performed to ensure the BES operates reliably and is the foundation upon which the Reliability Standards are based.

NERC Standards

The Alberta Electric System Operator (AESO) has been leading an initiative to adopt North American Electric Reliability Corporation (NERC) reliability standards as Alberta Reliability Standards. This important work contributes to the reliable operation of the Alberta electric system. The development of a more consistent set of standards is also essential in maintaining and improving the reliability of the North American electric grid.

AESO Standards

File Type Title Sort descending Effective Date Inactive Date
PDF EOP-004-2 BC Event Reporting
PDF EOP-004-3 BC Event Reporting
PDF EOP-004-4 BC Event Reporting
PDF EOP-005-1 BC System Restoration Plans
PDF EOP-005-2 BC System Restoration from Blackstart Resources {R3.1: Retired January 21, 2014}
PDF EOP-005-3 BC System Restoration from Blackstart Resources
PDF EOP-006-1 BC Reliability Coordination - System Restoration
PDF EOP-006-2 BC System Restoration Coordination
PDF EOP-006-3 BC System Restoration Coordination
PDF EOP-008-0 BC Plans for Loss of Control Center Functionality
PDF EOP-008-1 BC Loss of Control Center Functionality
PDF EOP-008-2 BC Loss of Control Center Functionality
PDF EOP-009-0 BC Documentation of Blackstart Generating Unit Test Results
PDF EOP-011-1 BC Emergency Operations
PDF EOP-011-2_BC Emergency Preparedness and Operations
PDF EOP-011-4_BC - Emergency Operations {Effective date: October 1, 2026, and as per BC-specific Implementation Plan}
PDF EOP-012-2_BC - Extreme Cold Weather Preparedness and Operations {Effective date: October 1, 2026, and as per BC-specific Implementation Plan}
PDF FAC-001-0 BC Facility Connection Requirements
PDF FAC-001-1 BC Facility Connection Requirements
PDF FAC-001-2 Facility Interconnection Requirements
PDF FAC-001-3 BC Facility Interconnection Requirements
PDF FAC-001-3_BC_errata
PDF FAC-001-4 with BC-Specific Implementation Plan
PDF FAC-002-0 BC Coordination of Plans For New Generation, Transmission, and End-User Facilities
PDF FAC-002-1 BC Coordination of Plans for New Facilities